PETROLEUM
CONTAMINATED SOIL PRE-BURN REQUIREMENTS
1. Required Tests and
Maximum Limits - F.D.E.P. 62-713
Parameter/Property
Maximum Limit/Conditions
TOTAL Arsenic(As) .5
ppm Det limit
TOTAL Cadmium(Cd)
TOTAL Chromium(Cr)
TOTAL Lead(Pb)
TRPH (Method Fla Pro)
VOH (Method 8021)
TOX
1000 ppm (SEE NOTE 2)
PCB
50 ppm (SEE
NOTE 2)
Det limit for PCB analysis is 20 ppb
2. Number of Samples for
above tests:
Less than 140
Tons 1
140 to 699
Tons 3
700 to 1399
Tons 5
Ea Additional 700
Tons 1
3. Other General
Requirements:
a. Letter from
Generator or Generator's Authorized Agent certifying
that:
i) Soil is NOT
Hazardous Waste or Mixed with Hazardous Waste
ii) Type of
Contamination (Gas, Diesel, etc)
iii) Source of
Contamination (UST, spill, etc)
b. Each load MUST be
accompanied by a Shipping Manifest
4. Notes:
(1) Higher metal
levels may be acceptable, subject to results of TCLP
analysis.
(2) TOX and PCB
analyses are required for all used oils, including used
hydraulic and mineral oils.
(3) Final acceptance
of soil is subject to approval at time of delivery. |